Skip navigation

iPDM PRO by IPC Integral · Born in the field

25+ years of industrial experience. Project leadership from day one. One platform built from that experience.

25+ years of industrial experience and 21 years directing oil, gas, and petrochemical projects turned into iPDM PRO: federation without replacement, deterministic verification, and accountable professional decisions. Applied and documented in the 6-B-1000 historical governed evidence.

The federated platform

Connect project information. Keep every system in authority.

iPDM PRO federates engineering, procurement, construction and operations information without replacing the systems that originate it. Evidence is verified, governance remains explicit, and authorized people decide.

Video content in text

A 56-second overview of disconnected project data becoming a governed federated platform across engineering, procurement, construction and operations. It presents the principles “Federate, Verify, Govern,” verifiable evidence, SHA-256, exact counts and Human Gates, and closes with an invitation to request a commercial assessment.

iPDM PRO corporate reel · English · 56 seconds · vertical format

The founder

Albino Piñeiro: field experience turned into method

Albino Piñeiro served for 21 years as CEO and EPC Project Director of IPC Integral, with direct accountability for schedule, budget, quality, and HSE across its documented contracts. He holds a PhD in Management Science from Rafael Belloso Chacín University — URBE and an MBA from Universidad Carlos III de Madrid.

Since 2020, he has been the founder and creator of iPDM PRO, a federated platform that turns industrial experience, models, schedules, costs, and documents into verifiable information for controlled decisions.

Albino originated the method; IPC Integral turned it into a governed, reproducible, and transferable system.

The asset becomes an information source

See iPDM PRO adoption in 22 seconds.

The physical asset remains the same. What changes is the continuity of its information: one identity connects the P&ID, 3D model, P6 schedule, costs, documents and asset record.

  1. 01Physical asset
  2. 02Connected data
  3. 03Verified decision
Conceptual visualization with illustrative data. It explains federation and traceability; it does not represent live telemetry or autonomous plant control.

From industrial experience to federated intelligence

More than 25 years of AECO experience transformed into operational intelligence.

IPC’s engineering, procurement, construction and maintenance experience in industrial, oil and petrochemical facilities is the technical foundation of iPDM PRO.

Conceptual transition from physical industrial equipment to its governed BIM representation with IPCito 2.0
Conceptual visualization · industrial field experience structured as federated BIM information. It does not represent a productive integration.
Holographic industrial engineering and field execution
25+ yearsIndustrial experience

Executed works and specialized services across the industrial, oil and petrochemical sectors.

Holographic integrated AECO delivery
Industrial AECOIntegrated execution

Engineering, procurement, construction and maintenance grounded in field evidence.

Holographic OpenBIM 4D and 5D integration
OpenBIM 4D/5DModel · cost · schedule

IFC, bSDD, IDS and BCF connected with APU, P6 and BEXEL controls.

Holographic federated iPDM management
Federated iPDMGoverned intelligence

Contracts, data, cost, schedule, evidence, AI assistance and accountable human approval.

Experience transformed into a digital method

IPC provides the industrial truth. iPDM provides continuity, intelligence and integration.

Historic records cover industrial works, maintenance, static equipment, storage tanks, piping, electrical and instrumentation scopes. iPDM does not replace that knowledge: it structures it as reusable requirements, classifications, model objects, cost rules, schedules and auditable approvals.

01Industrial evidence

Drawings, scopes, field records and lessons learned.

02BIM/OpenBIM structure

IFC objects, governed semantics and controlled exchanges.

03Operational decision

4D/5D analysis, traceability and human approval.

Conceptual industrial asset transitioning into a coordinated BIM digital twin
Conceptual visualization · physical industrial asset and governed digital twin.

Industrial capability

One execution vision, from field work to governed data.

IPC’s operating experience is reinforced by information management that remains auditable throughout the asset lifecycle.

Engineering & field execution holographic visualization

Engineering & field execution

Industrial engineering, construction, maintenance and specialized services for energy and process facilities.

Procurement with traceability holographic visualization

Procurement with traceability

Packages, technical requirements and vendor evidence governed from need through acceptance.

OpenBIM delivery holographic visualization

OpenBIM delivery

IFC transports the model, bSDD defines the vocabulary, IDS validates and BCF returns deviations.

Cost intelligence holographic visualization

Cost intelligence

AECO and APU structure costs, P6 programs the work and BEXEL supports governed 4D/5D analysis.

Federated information platform

iPDM PRO turns project information into controlled decisions.

Dynamic Standards governs meaning without replacing open standards. Each system retains its authority and every consolidation must pass explicit controls.

IPCito 2.0 holographic AI assistant representing governed access to project information
Conceptual AI assistant · recommendations remain subject to authorized human review and approval.
01

Requirement

Client documents, drawings, specifications and evidence.

02

Dynamic Standards

WorkScope, SystemView and ObjectClass normalize meaning.

03

OpenBIM

IFC · bSDD · IDS · BCF govern exchange and return.

04

4D / 5D

AECO/APU · P6 · BEXEL reconcile cost, quantity and time.

05

Decision

Power BI communicates; AI assists; an authorized person approves.

BIM maturity applied to IPC experience

From coordinated models to governed 4D/5D information.

The visuals explain the digital method. They are conceptual illustrations; project photographs remain separately identified as historical evidence.

Conceptual OpenBIM industrial model linked to schedule, quantities and cost
OpenBIM coordinationModel objects connected to quantity, sequence and cost controls.
Conceptual iPDM PRO federated ecosystem connecting BIM, project controls, OpenBIM standards and human-governed decisions
Federated iPDM platformSeven functional layers coordinate OpenBIM, cost, schedule, lineage, evidence and human approval without replacing each domain authority.

Mandatory controls

OpenBIM is a governed exchange, not a visual promise.

  1. 01Canonical identity and versioning
  2. 02CDE and approval states
  3. 03BCF return to the source
  4. 04IFC–APU–P6–BEXEL reconciliation
  5. 05Identity, authorization and audit

Verifiable status

Claims follow evidence.

VERIFIED

Federated G4 API and portal

Evidence-backed capability with reproducible validation.

PREPARED

OpenBIM cost intelligence

Architecture and controls defined; operational linkage is not implied.

HISTORICAL

IFC–P6–BEXEL linkage

Limited technical exercise pending full project reconciliation.

6-B-1000 · historical governed evidence · data cut September 27, 2026

Figures linked to their public evidence

IPC Integral historical governed evidence. Inventory and reconciliation are verified; proposed identifiers and renames remain subject to engineering validation. These results do not guarantee performance on third-party facilities.

Download the complete evidence package (ZIP) →

IPC Company USA

Bring field execution and digital control into one project vision.

Corporate contact and locations

Connect with IPC Company USA.

U.S. filing reference
5890 S Semoran Blvd
Orlando, FL 32822 · USA
Documented head office · Venezuela
Sector Bella Vista, Calle 63A con Av. 5, Local N.º 5-18
Maracaibo, Estado Zulia · Venezuela
Documented operating base · Venezuela
Sector Ballena II, Vía El Trueno, Hacienda Matías Carré
Los Puertos de Altagracia, Estado Zulia · Venezuela

Addresses come from the latest available public filing and corporate portfolio. Please confirm before visiting.